Trambesòs Tram

    The project includes two double track lines, except for a section with single track in Plaça de les Glòries. The Trambesós network has a total of 28 stations, 11 of which link to metro and suburban rail stations. The fleet consists of eighteen 32.5-m long carriages with a capacity for 230 passengers. The contract also includes a building to house its facilities.

    Nearly the entire line runs through the downtown core of Barcelona, Spain's second-largest city and one of the most densely populated cities in Europe. The line is completely integrated with Barcelona's public transportation network.

    The project involves the design, construction, financing, operation and maintenance as well as the provision of the rolling stock. Payments are based on an availability mechanism until it is turned back over in 2032. The project is currently operational, since construction was completed in 2008.

    General Information

    Location
    Barcelona, Spain
    Contract
    Design, construction, financing, operation and maintenance
    Infrastructure
    New tram line of 14 kilometres including 28 stations
    Year of project completion
    2008

    discover other flagship projects

    A-30 Highway

    Quebec, Canada

    The contract includes the design, construction and financing of a 42-km highway and the subsequent operation of 74 km, consisting of the new section and an existing 32-km section.

    Toowoomba Second Range Crossing

    Queensland, Australia

    41 km bypass motorway north of the city of Toowoomba in the state of Queensland. Australia.