The Navarre Canal is the largest hydraulic infrastructure in Navarre. It is a concession contract for the construction and operation of phase 1 of the irrigable area of the Navarre Canal, covering a surface area of 26,233 hectares (gross surface under the bid), a drainage length of 344 kilometres, 980 kilometres of roadways and a demand of 90 hm3/year.
Phase I contract for the Irrigable Area of the Navarre Canal is being developed through a shadow toll mechanism, by means of which the concessionaire is entitled to receive a monthly payment from the Authority for a period of 30 years, as consideration for the use and availability of the facility, which is linked to the quality of the irrigation service provided by the former.
Water supplied through the canal is sourced from the Itoiz reservoir. This reservoir not only serves the purpose of storing water but also produces electricity. The reservoirs regulating the canal are located in Villareta, Monreal and Artajona. Since the canal is generally more elevated than the lands irrigated by it, the water basically moves due to gravity, making the use of pumping units almost residual.
The concessionaire provides maintenance and rehabilitation services through a shadow toll payment model. The project has been in operation since 2011.
The contract includes the design, construction and financing of a 42-km highway and the subsequent operation of 74 km, consisting of the new section and an existing 32-km section.