A-2 Motorway Section 2: Radial 2 - L.P. Soria-Guadalajara

    Concession for the construction, renovation, restoration and conservation of an existent shadow toll road measuring 77.5 km long, in the section between the Ring road 2 (Guadalajara) and the provincial border with Soria.

    In the 77.5-km section, the A-2 motorway is the main artery of the Spanish road network, linking the cities of Madrid and Barcelona.

    The works expected in the road are classified according to the following three areas:

    • Area 1: Renovation and first set-up.
    • Area 2: Replacement works and intensive repair.
    • Area 3: Operation works and maintenance of the road.

    In 2026 the contract will expire and the infrastructure will be handed over to the client.

    General Information

    Location
    Guadalajara, Spain
    Contract type
    Construction, remodelling, restoration, operation and maintenance
    Infrastructure
    Rehabilitation and maintenance of existing A-2 road measuring total length of 77.5 km.
    Year of project completion
    2013

    discover other flagship projects

    A-30 Highway

    Quebec, Canada

    The contract includes the design, construction and financing of a 42-km highway and the subsequent operation of 74 km, consisting of the new section and an existing 32-km section.

    Toowoomba Second Range Crossing

    Queensland, Australia

    41 km bypass motorway north of the city of Toowoomba in the state of Queensland. Australia.

    Move up